St Stephens Bolton

Client: St Stephens COFE PS Bolton

Duration: 5 weeks

Value: £50,000

This scheme was awarded to PJ Services after a compettitve tender process. The works was carried out in term time. This meant we wroked with the school to reduce noise and ensure all works were carried out in a safe manner at all times. Despite the tight programme, the job was completed on time and to budget.

Works:

  • Drainage internal alteration
  • Demolition of internal walls and tiolet
  • New cubicle, IPS and kitchen
  • Steelwork
  • White rock wall
  • Vinyl flooring
  • Electrical and mechinical 
  • Pavings
  • Aluminium doors and windows